Support for the vocational training of employees II (POVEZ II)

Support for Vocational Training of Employees II (POVEZ II). Employee Training at the Company We have built upon the project „Support for Vocational Training of Employees II (POVEZ II),“ which we began in 2019. It is focused on the training of employees at Dopravní podnik města Hradce Králové, a.s. (Public Transport Company of the City of Hradec Králové, joint-stock company), ranging from public transport drivers to top management. A portion of the public transport drivers, thanks to this program, which [...]
Modernization of the Buzulucká exchange plant, Hradec Králové

Modernization of the Buzulucká Substation, Hradec Králové The goal is to modernize the existing facility for electricity distribution to ensure power supply for the trolleybus overhead line network on lines serving the city center, including the associated reconstruction of the building necessary for the overall technological overhaul.
Equipping DPMHK, a. s. public transport vehicles with a camera system and a passenger counting system

Equipping Public Transport Vehicles of DPMHK, a.s. with a Camera System and Passenger Counting System. The realization of this project will lead to the introduction of a comprehensive camera system and passenger counting system in all public transport vehicles in Hradec Králové.
Modernisation of the DPMHK trolleybus fleet - IROP/IROP ITI

Modernization of DPMHK's trolleybus fleet – IROP/IROP ITI The project will involve the acquisition of 4 trolleybuses with auxiliary battery drive, 18-meter category, and 6 trolleybuses with auxiliary battery drive, 12-meter category, with the aim of reducing transport emissions and increasing the attractiveness of public transport. The project will involve the acquisition of 7 trolleybuses with [...]
Modernization of the electronic passenger check-in system in public transport in Hradec Králové

Modernization of the system of electronic passenger check-in in public transport in Hradec Králové The project will modernize the system of electronic passenger check-in in public transport in Hradec Králové.
Modernization of the substation Nový Hradec Králové

MODERNIZATION OF THE NÝCHROV HRADEC KRÁLOVÉ SUBSTATION As part of the project, the existing equipment for distributing electrical energy was modernized to ensure the power supply of the 600 V DC trolleybus line network in the areas of Moravské Předměstí, Nový Hradec Králové, and Malšovice.
Trolleybus line Pod Strání

TROLLEYBUS LINE UNDER STRÁNÍ Within the project, a new trolleybus line with a total length of 0.87 km was built from Brněnská Street through Palachova and Milady Horákové Streets to the final stop Pod Strání.
Construction of a substation at the Cihelna public transport terminus in Hradec Králové

CONSTRUCTION OF A TRANSFORMER STATION FOR THE CIHELNA PUBLIC TRANSPORT TERMINAL IN HRADEC KRÁLOVÉ As part of the project, a new transformer station was built to provide supplementary DC 600 V power to the existing trolleybus lines and to power charging stations for electric buses.
Purchase of 6 trolleybuses with auxiliary battery drive for public transport in Hradec Králové

ACQUISITION OF 6 TROLLEYBUSES WITH AUXILIARY BATTERY DRIVE FOR PUBLIC TRANSPORT IN HRADEC KRÁLOVÉ The project involves the acquisition of 6 trolleybuses with battery drive, which will replace 3 diesel buses, thus reducing the environmental burden caused by the operation of public transport vehicles, specifically noise and emission pollution, especially particulate matter.
Acquisition of electric buses and trolleybuses with auxiliary drive for public transport in Hradec Králové

ACQUISITION OF ELECTRIFIED BUSES AND TROLLEYBUSES WITH AUXILIARY DRIVE FOR PUBLIC TRANSPORT PURPOSES IN HRADEC KRÁLOVÉ As part of the project, 3 trolleybuses with battery drive and 5 electric buses will be acquired, which will replace 8 diesel buses, thereby reducing the environmental burden caused by the operation of public transport vehicles, specifically noise pollution and emission pollution, especially particulate matter.